PULP & PAPER MILLS

Keep Critical Electrical Systems Moving Through the Outage, and Between Them

Pulp and paper mills combine heavy motor loads, drives, generators, boilers and auxiliaries, process controls, aging distribution, harsh operating conditions, and narrow outage windows. Electrical reliability affects production, quality, safety, and the ability to restart on schedule. POWERX connects studies, NETA testing, motors and generators, P&C, SCADA/PLC/HMI, cable, maintenance, diagnostics, outage execution, and modernization around the mill’s operating plan.

Plan a Mill Outage or Reliability Program
Pulp & Paper Mills hero: a real POWERX crew working in this environment

What Matters Here

  • Large motors, drives, generators, and process continuity
  • Aging switchgear, breakers, transformers, cables, and controls
  • Arc flash, power quality, harmonics, voltage, and motor starting
  • Planned outage scope, critical path, and return to service
  • Moisture, dust, heat, vibration, contamination, and equipment condition
  • Legacy drawings, obsolete equipment, and phased modernization

Systems & Assets We Support

Mill distribution; motors, drives, generators; boilers and auxiliaries; switchgear, breakers, transformers, relays, cable, grounding; process controls, SCADA/PLC/HMI.

How POWERX Supports the Lifecycle

01
Engineering & Power System Studies

Studies and outage planning

›
02
Design, Integration & Packaged Solutions

Protection, controls, replacement design

›
03
Construction, Testing & Commissioning

Outage testing, equipment and controls commissioning

›
04
Operations, Maintenance & Training

Maintenance, diagnostics, condition assessment

›
05
Upgrades, Retrofits & Modernization

Phased legacy modernization

Why POWERX

POWERX helps teams define equipment priorities, isolation plans, test sequences, repair decision points, retesting, and return-to-service criteria before the outage clock starts.

Proof

Project photo: approved pulp & paper mills work

Approved project categories only.

FAQs

Can POWERX work within a mill outage window?
Yes, subject to staffing and approved scope. Equipment priority, isolation, test sequence, repair decision points, retest, and return-to-service criteria are planned before the outage.
Can POWERX modernize legacy relays and controls in phases?
Yes. Field verification, temporary states, interfaces, outage sequence, settings, communications, testing, and documentation are engineered as part of the phased plan.
Can the maintenance program prioritize critical assets?
Yes. Criticality, condition, duty, environment, production impact, spares, and failure history guide the program.

Plan a Mill Outage or Reliability Program

Plan a Mill Outage or Reliability Program
XAcademy

XAcademy delivers engineering, protection & control, NETA testing, certifications and compliance, asset reliability, and discipline-specific commissioning education across the lifecycle of critical power systems. Learn from industry veterans with hands-on lab training, mobile P&C/SCADA courses, and workforce development programs.

Talk to an Instructor
About
  • Our Story
  • Mission, Vision & HEART
  • Leadership
  • Locations
  • Safety & Quality
Services
  • Services Overview
  • Engineering & Studies
  • Substation & Packaged
  • Protection & Control
  • Certifications
  • NETA Field Services
  • Training & Courses
Our Edge
  • Utility Services
  • Genelco
  • Inrush
  • Elect
  • Paradigm
People
  • XAcademy Training
  • Careers
  • Life at POWERX
  • Benefits
  • Military & Veterans
  • Apply Now
Connect
  • Service Sheets & Resources
  • Talk to an Expert
  • 855-7-POWERX
  • LinkedIn
  • Privacy Policy
  • Terms and Conditions
  • Accessibility