New Equipment Should Not Require Blind Trust
Before a new or modified electrical system is placed in service, the project team needs evidence that equipment is installed correctly, configured as intended, and ready to perform. POWERX provides acceptance testing for critical electrical assets, coordinating procedures, documentation, deficiencies, and project interfaces around the energization plan. The value is not only a pass-or-fail result. It is a clear record of what was tested, what was found, what must be corrected, and what is ready to move forward.
What the Work Can Include
- Transformers, switchgear, breakers, relays, cables, grounding, UPS, batteries, transfer equipment, motors and generators
- Visual, mechanical, electrical and functional checks defined by equipment, specifications and applicable standards
- Coordination with construction, commissioning, utility, OEM and energization activities
- Deficiency identification, corrective-action tracking and retesting when included
What the Customer Receives
- Test plans and equipment records
- Calibrated test data and criteria
- Deficiency and retest records
- Final report and readiness documentation
When to Engage POWERX
- New construction and major expansions
- Equipment replacement or field modification
- Construction turnover before energization
- Projects requiring coordinated testing and commissioning
How This Connects
This scope can connect to related engineering, field services, POWERX Edge specialists, and Genelco when facility-level Level I–V integrated commissioning is required.
FAQs
New equipment can be damaged in shipping, installed incorrectly, configured inconsistently with design, or affected by construction conditions. Acceptance testing establishes documented readiness before service.
Typical scopes may include transformers, switchgear, breakers, relays, cables, grounding, UPS, batteries, transfer equipment, motors, generators, and related assets. Final scope depends on equipment, voltage, specifications, and qualified resources.
It is generally coordinated after installation and required prechecks but before final energization or turnover. Factory, utility, P&C, equipment-commissioning, and Genelco integrated-commissioning hold points may also apply.
No. It may support commissioning, but acceptance testing verifies defined equipment and installation criteria. Facility-level Level I–V and integrated commissioning is a separate Genelco scope.